Match the document to the decision

IPC-2223 addresses flexible and rigid-flex design; IPC-6013 addresses qualification and performance of flexible printed boards. Select applicable acceptance and assembly documents with the responsible customer and supplier. Connect these choices to the fabrication drawing. A topic preview or revision listing identifies scope and editions, but does not provide the complete criteria needed to assess compliance.

Requirements by purpose

Investigation itemQuestionEvidence to retain
DesignWhich rules guide construction and layout?Applicable design document and revision
PerformanceWhat must the finished board demonstrate?Contracted performance requirements
AcceptanceHow are observed conditions dispositioned?Agreed acceptance basis and exceptions
AssemblyWhat governs populated joints and workmanship?Applicable assembly requirements and scope

Create a contractual requirement record

Record document titles and revisions, relevant class or product category, addenda, customer-specific requirements, and approved departures. Assign responsibility for resolving conflicts. Use the inspection plan to explain how critical requirements will be checked and reported. Do not let a later standard revision silently replace the edition actually reviewed for an existing design.

Ask for evidence tied to the delivered build

Identify which material records, inspections, tests, and reports demonstrate the agreed requirements. Separate a company’s certification claim from the acceptance evidence for a particular circuit. No certification or process capability is established by this website’s source links. Review the complete applicable documents with qualified owners before making a compliance statement or accepting an exception.

Before you release the design

  • Write exact document identifiers and revisions.
  • Agree class, addenda, and customer-specific requirements where applicable.
  • Resolve conflicting notes before fabrication release.
  • Request records that correspond to the agreed build and requirements.

Watch points

  • A public table of contents cannot establish that an unseen clause is satisfied.
  • Linking to a standard does not certify a supplier or product.

Practical questions

Should I always specify the newest revision?

Review the edition appropriate to the customer contract and qualification basis. Check the official register, then agree any migration rather than changing an established requirement automatically.

Is an IPC class label sufficient for an RFQ?

No. Identify the relevant documents, revisions, construction, acceptance details, tests, and reporting needs. The class is only part of a complete requirement set.

Technical references

References support the material or design context. Check the exact grade, part number, document revision and project conditions before release.

Updated 27 September 2026 · Technical content policy · Engineering guidance supports project review; the agreed drawing defines the build.